Asphalt Services in Jensen

Jensen sits low along the Green River, and its pavement deals with January nights near 3°F and July afternoons in the 90s. Basin Sealcoat & Striping paves, patches, sealcoats, resurfaces, and stripes asphalt for Jensen homes, farms, and businesses along US-40. We look at the ground first, because river bottom soil and farm traffic call for a base that won’t settle.

Request A Quote

River Bottom Ground and Monument Traffic

Jensen started as a ferry crossing on the Green River, and a lot of the town still sits on the low ground near the water. Soil near a river holds moisture longer than you’d expect, so a driveway or lot here needs a well drained base that won’t soften every spring. Farm equipment rolling in and out of long gravel approaches adds weight right where the asphalt meets the road.

Summer brings other traffic. SR-149 runs from US-40 up to the Dinosaur National Monument Quarry entrance, and plenty of visitors pass through Jensen on the way. Businesses near that route need lots that look cared for and handle RVs and trailers turning in. We build and maintain pavement with both crowds in mind.

Our Asphalt Services in Jensen

Asphalt Paving

New asphalt driveways and farm lane approaches in Jensen, built on a drained, compacted base that stays put on low ground.

Asphalt Repair

Patching, crack sealing, and pothole fixes for Jensen pavement before river valley moisture and frost make the damage worse.

Asphalt Sealcoating

A fresh sealcoat that shields Jensen driveways from long summer sun, snowmelt, and dripping oil.

Asphalt Resurfacing

An overlay that gives tired but structurally sound Jensen pavement a smooth new surface without tearing it out.

Parking Lot Paving

New parking lots for Jensen businesses, laid out for drainage and wide enough for RVs and trailers to turn around.

Parking Lot Repair

Repairs for Jensen business lots, from broken edges near the highway to potholes that trip up customers.

Parking Lot Resurfacing

A new top layer for faded, cracked Jensen parking lots that still have a solid base underneath.

Parking Lot Sealcoating

Routine sealcoating that keeps Jensen commercial lots looking sharp through busy summers and cold winters.

Parking Lot Striping

Stall lines, arrows, and ADA markings that help Jensen visitors park and get back on the road quickly.

What Jensen Property Owners Get From Good Asphalt

Pavement that’s built right handles farm weight, river valley moisture, and summer visitors without falling apart. In Jensen, that means fewer surprises after every winter.

Keeping Jensen Asphalt in Shape Year to Year

Jensen pavement sees bitter January cold and dry, hot summers, so cracks open and close all year. Seal them while they’re small, ideally in late summer, and plan a sealcoat about every two to three years.

Business lots near the highway get more turning traffic and should be checked each spring. We’re happy to walk your Jensen property and tell you what can wait.

Why Jensen Chooses Basin Sealcoat & Striping for Asphalt

We’re a Uintah Basin crew that knows the ground along the Green River and the traffic that heads up to the monument.

Local Know How

We understand how low, damp ground along the Green River behaves under weight, and we build Jensen bases around it.

Right Equipment

Our crews bring paving and compaction gear matched to farm lanes, home driveways, and highway frontage lots alike.

Honest Advice

When a Jensen driveway only needs crack sealing and a sealcoat, we'll say so instead of pitching a full repave.

Clean Job Sites

We keep materials contained, sweep up when we're done, and plan around your schedule so Jensen customers can still reach you.

Jensen Asphalt FAQs

Real questions we hear from Jensen homeowners, farmers, and business owners.
Is the ground near the Green River a problem for paving in Jensen?
It can be if it’s ignored. Low ground often holds water, so we check how wet the soil stays and build up a drained, compacted base before any asphalt goes down. That keeps the surface from settling or cracking early.
Yes. That transition takes a beating from tractors and trucks turning in. We widen and thicken it as needed so the edge doesn’t crumble the first time a loaded rig cuts the corner.
Hot mix needs warm air and ground to bond and compact properly, and Jensen winters get well below freezing. Most paving and sealcoating happens from late spring to early fall. Small patch work can sometimes stretch a little longer.
Plan for wider drive lanes, longer stalls, and a thicker section where big rigs turn. Clear striping helps too, since visitors don’t know your layout. We’ll sketch out options when we visit.
Every two to three years is a good rule for most homes. Long, sunny summers dry the surface out, so a gray, chalky look is your cue that it’s time.
Yes. Sealcoat covers existing lines, so we restripe stalls, arrows, and ADA spaces right after it cures. Your Jensen lot reopens looking organized.
Yes. Call (801) 669-0512 or send a quote request, and we’ll set a time to look at your Jensen driveway or lot and give you a free estimate.

How Our Jensen Asphalt Process Works

Here’s what to expect from the first visit through the final walk around your Jensen pavement.

Site Assessment

We visit your Jensen property, look at the soil, slope, and existing surface, and talk about who drives on it before we price anything.

Surface Prep

Our crew strips failed material, fixes soft spots, sets the grade so water runs off, and compacts the base in lifts.

Application

We lay asphalt, fill cracks, apply sealcoat, or paint lines at the right thickness and temperature for the day's weather.

Final Walkthrough

We walk the finished surface with you, point out cure times, and explain simple care that helps your Jensen asphalt last.

Request a Free Asphalt Estimate in Jensen

Whether it’s a farm lane apron or a roadside lot, call (801) 669-0512 and we’ll come take a look.