Naples has grown by roughly 30 percent since 2010, and a lot of that growth starts on a piece of ground nobody has touched in years. Kochia, cheatgrass, rabbitbrush, a few volunteer trees, maybe an old corral or a pile of scrap metal. Before anyone can stake a foundation, all of that has to go, and it has to go without wrecking the soil you’ll build on.
Our lot clearing in Naples covers the whole job: brush and trees down, stumps and roots pulled, rock and debris loaded out, and the ground left smooth enough to walk and survey. We flag what you want to keep first, so the shade tree or the windbreak along the fence stays put. You end up with a lot you can actually plan around.
Our shop on S Vernal Ave is a few minutes away, and we know Ashley Valley soils, weeds, and Uintah County footing rules.
Excavators, skid steers, and dump trucks sized for anything from a subdivision lot to open commercial ground off the highway.
If your lot only needs a brush clear instead of a full scrape, we'll tell you and quote it that way.
We leave flagged trees untouched, haul every load we create, and finish with smooth ground instead of deep ruts.
Naples has been one of the faster growing spots in Uintah County, going from a quiet farm town to a small city of about 2,300 people. Some of that growth is new subdivisions. A lot of it is older properties on big lots getting split, sold, or finally built on. Either way, the ground usually needs work before anything else can happen.
Land that sits idle in the Ashley Valley fills in fast. Kochia and cheatgrass take over bare dirt, goatheads creep in along the edges, and a few Russian olives can turn into a thicket in a handful of seasons. Clearing gets that cover off so you can see what you’re really working with.
The best lot clearing jobs start with a plan for what comes next. Before we bring in a machine, we want to know where the house or shop will sit, where the driveway will run, and where septic and utility lines are likely to go. That tells us how much ground needs to be fully opened up and how much can just be brushed out.
It also tells us what to leave alone. A mature tree on the south side of a future house is worth saving in a valley with hot summers and strong sun. We flag keepers on day one and work around them.
Clearing to the right depth matters too. Scraping off more soil than needed leaves low spots that collect water, while leaving roots behind in a building pad can cause settling later. We match the clear to the plan, not the other way around.
Pulling stumps and rock is digging, and in Utah, whoever digs makes the 811 Blue Stakes call. The request has to go in at least 3 business days before work starts, but no more than 14 calendar days ahead, and the ticket expires after 21 days. We place it and schedule around those dates so the marks are fresh when the machine shows up.
Marking covers public utilities. Private lines, old wells, and buried pipe on older Naples farm lots don’t always show up, so tell us about anything you know or suspect is underground. A quick heads up from you can save a broken line and a lost week.
Every lot is different, and a few things drive the scope more than anything else:
If a lot has big trees or a dense line of Russian olive, our tree stump removal work handles the roots so they don’t fight your excavation crew later.
Not every Naples lot is residential. The US-40 corridor and the light industrial parks north of the highway draw a steady stream of shops and yards, plenty of them tied to the oilfield traffic running down SR-45 toward Bonanza. Those sites usually need a wide, open clear with space for trucks to swing around and room for parking or laydown areas.
On commercial ground, junk is often a bigger job than brush. Old pallets, pipe, cable, and broken equipment can pile up on a vacant lot, and debris hauling gets it gone in the same visit.
Clearing is the first step, not the last. Uintah County requires footings at least 30 inches below grade, so your foundation crew is going to dig deep, and they’ll move faster without roots and rocks in the way. Getting the footprint fully cleared now saves time and money on the next phase.
Bare ground doesn’t sit still for long, either. Spring wind moves dust and weeds jump on open dirt. When you’re ready to shape the site, grading sets the slope for drainage so snowmelt and summer storms run away from where you’re building.
We walk the lot with you, flag keeper trees, and look at access, soft spots, and what's coming after clearing.
You get a written quote that lists what's being removed, what stays, how material leaves the site, and the finished condition.
With Blue Stakes marks in place, we cut, pull stumps, load debris, and keep topsoil separate if you want it saved.
We walk the cleared lot together, check the flagged trees and boundaries, and talk through grading or excavation next.