Surveyor Adolph Jessen named Manila back in 1898, and the town has grown slowly ever since. Many of its business lots were paved years ago and have been patched as needed since then. When the patches start to outnumber the original pavement, an overlay is often the most practical next step.
Resurfacing puts a new layer of hot mix over the existing lot. Before that happens, we check for base failure, cut out and rebuild soft spots, fill cracks, grind edges at doors and entrances, and apply a tack coat so the layers bond. Then we pave, roll, and restripe. Since Manila is a long drive for our crews, the work runs as a scheduled trip, and we phase it so customers can still get in.
We know how Manila snow, highway trucks, and summer trailer traffic wear a commercial lot, and we plan overlays to match.
Our crews bring grinding, paving, and rolling equipment sized for business lots so the overlay goes down smooth and tight.
If your lot needs reconstruction rather than an overlay, we will tell you clearly and explain what we saw.
We keep work zones fenced off, guide customers around active areas, and sweep and clean the lot before reopening.
A lot is a good resurfacing candidate when its problems are mostly on top. You might see a faded gray color, loose stones, scattered cracks, and a lot of old patches, but the pavement still carries trucks without sinking or rutting badly. That tells us the base is doing its job and only the wearing layer is tired.
On the other hand, if the lot has wide areas of alligator cracking, deep ruts, or spots that pump water when vehicles pass, the base is failing. An overlay on top of that will crack in the same places within a few seasons. We test both possibilities on the site visit and tell you what we find.
Resurfacing and reconstruction both leave you with a fresh black lot, but they get there differently and cost very different amounts. Some points to consider:
If most of the lot needs reconstruction anyway, a full rebuild through new parking lot paving may be the better long term value.
The overlay is only as good as what it sits on, so prep takes real time. We cut out any failed areas and rebuild the base beneath them. Wide cracks get cleaned and filled so they do not reflect up through the new layer as quickly. Oil soaked spots get treated or removed.
Next, we grind the edges where the lot meets doors, curbs, sidewalks, and the road. That lets the new asphalt tie in flush instead of leaving a lip. Finally, a tack coat goes down across the whole surface to glue the old and new layers together. Where damage is limited and an overlay is not needed yet, targeted parking lot patching and repair may hold you over for a few more years.
Closing an entire lot can be tough for a shop, a motel, or a church with a weekly schedule. We usually split resurfacing into sections, keep at least one entrance open, and move customers from one side to the other as each section is paved and cooled.
Because our crews travel out on scheduled trips, we set the phases ahead of time and share the plan with you. Many owners choose to resurface in late spring before lake visitors arrive in numbers, or in early fall after the busiest stretch winds down.
Communication matters during a phased job. We let you know the night before which side of the lot closes next, so you can post a sign, warn regular customers, or move staff parking. Small steps like that keep a resurfacing project from turning into a headache for anyone.
An overlay is a chance to fix water problems that have been bothering you for years. If a corner of the lot always holds a puddle, we can build it up with the new layer so water runs off. If melt from plowed snow drains toward your entrance, we can adjust the slope to send it elsewhere.
Manila gets around 38 inches of snow a year, and every pile on the lot eventually becomes runoff. Getting the grade right during resurfacing means less ice on cold mornings and less water working under the pavement. It also makes plowing easier, since a smooth, even surface lets the blade ride clean instead of catching on old patches and seams.
Once the new surface cools, the lot needs fresh markings before it opens. New lot striping and stall layout gives you a chance to add trailer spaces, move accessible stalls closer to the entrance, or improve traffic flow.
After the overlay has cured for a season, plan on a sealcoat and regular crack filling. Those simple steps keep the new surface tight and dark, and they help push the next major project much further down the road.
We survey the lot, check for base failure, look at drainage, and discuss how and when your customers use it.
Your free quote covers base repairs, grinding, overlay thickness, phasing, restriping, and the planned trip window.
We repair and prep the old pavement, apply tack coat, pave the overlay in phases, and restripe each finished section.
We walk the resurfaced lot with you, confirm drainage and markings, and explain when heavy trucks can return.